So, we hold that the neural network method is claims precedence over all others method in making Unemployment Crisis Fore-alarming System. 因此,在构建我国的失业风险预警系统中,神经网络模型应该是一种被优先考虑的方法。
Algorithm modeling goals precedence relations based on transferability closure The Analysis of the Principle and Method of Adjective Eclipsed Form Definition 目标时序关系的形式定义和建模算法形容词重叠式界定的原则与方法探析
Application of precedence order method in optimum selection of sewage treatment works 优序法在污水处理厂优选中的应用
Precedence order method was used in optimum selection for sewage treatment works, Analysis showed that the method possessed sample operation, reasonable results and good practicality. 将优序法用于污水处理厂的优选。实例分析表明,该方法计算简便,结果合理,实用性强。
Precedence Chart is a math-statistics analysis method, which is used for analyzing the importance of each factor to the target by matrixes chart, and offering basis for management decision-making. 优序图法是一种用矩阵图示的办法分析各因素(条件)对目标(项目成败、服务质量)的重要程度,为管理决策提供依据的数理统计分析方法。
Application of Precedence Order Method in Comparison of Environmental Quality 优序法用于环境质量的比较
Three algorithms, extrapolation method, small segment precedence method and natural ascending order, were given to search for elements in the same line and row of rectangle with unit 1 in testing the second sufficient necessary condition; 在第二性质测试中,对搜索与单位元1构成矩形的同行、同列元素中提出自然升序法、外推法及小段优先三种算法;
In this paper, we propose a programmed method to draw an optimal AOA ( activity on arrow) network diagram according to the schedule of ordinary precedence activities and give an example to illustrate the application of this method. Multithreading Process and Schedule 提出了一种根据普通紧前工序表绘制最优箭线式网络图的程序化方法,并例举了一个应用该方法绘制最优箭线式网络图的实例
On the basis of the risk analysis model for precedence network schedule, the computational programs for the risk of precedence networks by the Monte Carlo ( MC) method and the simplified analysis method were proposed. 在建立搭接进度网络完工概率模型的基础上,分别提出了用MC(MonteCarlo)方法计算搭接进度网络完工概率的步骤和搭接进度网络完工概率的简化分析。
Focusing on the assembly precedence relations ′ automatically generating and the geometry feasible assembly sequences planning, a systematical method named Geometry Constraints Analysis ( GCA) is proposed. 在系统分析相关文献的基础上,重点针对装配优先关系推理和几何可行装配顺序计算,提出了一种系统化的分析方法&几何约束分析方法。
Thirdly, according to Project Management theory, it discussed Critical Path Method ( CPM) and Precedence Diagramming Method ( PDM) in the light of a designing enterprise. 然后,结合设计企业经常接触的项目管理的理论,结合某设计企业,讨论了项目进度计划关键路径法(CPM)及资源分配管理方法&优先日程图示法(PDM)。
After the lag procedure introduced, the precedence network is transferred into generalized PERT network, and then the risk of construction schedule could be calculated with the MC method or the modified PERT method. 引入时距工序后,将搭接网络转化为广义PERT网络,然后用MC方法或用当量概率修正PERT方法计算搭接施工网络进度风险。
WEIGHTED PRECEDENCE ORDER METHOD FOR MCDM Retiming in Logic Synthesis of ASIC 加权多目标决策优序法ASIC逻辑综合中重定时序
Aiming at the characteristics of m-dimensional removable of airborne equipment, extends the values and description of disassembly precedence constraints relationship, the analysis method is discussed, and gives a engineering simplified analysis processes. 针对机载设备m维可拆卸的特征,扩展了拆卸优先约束关系的取值和表征,就其分析方法进行了讨论,并给出了工程化的简化分析流程。